)Appendix2(附件2Maintenance InspectionReport(维保检验报告)Name ofbuilding Timecommenced(建筑物名称)(开始时间)CustomersModel/EL No.Time completedSignature(电梯编号)(完成时间)(客户签名)Checked byDate(检查人员)(日期)Working Remarks:No workwas carried out,checked itemsV:Normal(正常)in goodcondition(无需工作,检验项目良好)△:To beadjusted,replaced,lubricated:Items checked,works tobe followed-upcleaned(需要调整、更换、润滑、清洁)(被检验项目,工作需跟进):Equipmentcomponent tobe repairedX Tobe repairedor overhauledoroverhauled(需要维修或者大修)(设备或者部件需进行维修或者大修)O Serviced,replaced,lubricatedcleaned:Works werecarriedout(维护、更换、润滑、清洁)(执行相关工作)/:Not applicable:Equipment doesnot includesuch items(不适用)(设备没有此检测项目)(运行评注)(机房)
1.Machine RoomCheck Point ToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)PartVacuum cleaner/Eye(清洁)Cleanliness(吸尘器/目测)check(锁)(钥匙)Lock Key(照明Light switchillumination IlluminometerOver100LuxMachine room及灯开关)(照明光度计)(大于100勒克(机房Environment斯)环境)Temperature(温度)-10〜+40℃(温度计)Thermometer(通风)(目测)Ventilation Eye check(抱闸Brake leverManual handle(目测)Eyecheck杆手动手柄)-15〜10%(电压指示)(检测器)Indication voltageTester(include startdrop)(包括衰减)(松动/损(扳Looseness,damage Spanner,screw driverMainsupply Switch坏)手/螺丝刀)(主供电闸)Vibration,heat Hands,eye(振动/发热)(手感/目测)Fuse Eye,tester(保险丝)(目测/检测器)(听/说)Ear,voice(内置(呼叫/接通)Inter-phone Transmit,reception电话)Over DC12V(检测器)Tester(电压指示)(直流大于伏)Indication voltage12Wire connections(电源线)(螺丝刀)Screw driver(主电动TM MotorOver1MQ(欧姆表)Ohmmeter机)(接地电阻)(大于兆欧)Resistance toearth1(噪音/振(观/听/Noise,vibration,heat Eye,ear,hands动/发热)触摸)Noise,vibration,heat(噪音/振Eye,ear,hands(观/听/-10〜70℃Rotary encoder(旋动/发热)触摸)(-10〜70摄氏度)转编码器)(接线插(螺丝Wire connections,pipe Screw driver,eye头/走线管)刀/目测)(松动/对(扳手/目Looseness,alignment Spanner,eye齐)测)(减震压缩Rubber compression15%compression(直尺)Ruler量)(压缩)15%Grease onbearings(轴承油)Grease gun(注油枪)(标准尺/目Gauge,eye Levelmark(驱动主TR M/C(油位/更换)测)(油位标记)Oil level,replace机)(曳引绳磨损)(测径器)Rope wearCalipersWear sheavegrooves andrope派See
7.6(曳引轮(尺/目测)replacement referenceRuler,eyes(注意见
7.6)绳槽磨损及更换)(噪音/振(观/听/Noise,vibration,heat Eye,ear,hands动/发热)触摸)Compression springRuler(直尺)X See
8.2CM
8.2)(弹簧弹性)Brake(抱闸)Wear linings(闸瓦磨损)Ruler(直尺)派See
8.2(JSL
8.2)Stroke(行程)Ruler(直尺)派See
8.2^
8.2)Proper operation(运行状态)Eye,ear(观/听/触摸)X See
8.2(M
8.2)(松(扳手/目Looseness,rotation alignment Spanner,eye动/同轴旋转)测)(抹Cotton waste,driver(清洁度)Cleanliness(限速器)伟)Governor(动作灵敏)(无滑动)Tripping Noslip(油Oil can,cotton waste(连接线润滑)壶/抹布)Lubrication onlink(控制面板)
2.Control PanelPart Check Point ToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(清洁度)(吸Cleanliness Vacuumcleaner brush尘器/毛刷)Installation condition(安装环境)(扳Spanner,screw driver(松动)手/螺丝刀)Looseness(电源Indication powervoltage±10%电压指示)Tester(检测器)(断路器)MCCB(松动)(扳Looseness Spanner,screw driver手/螺丝刀)(信号电Control,signal voltage(控制压)(检测器)Control signalTester信号)(阻Resistance control,signal Over
0.5MQ抗)(欧姆表)(大于兆欧)Ohmmeter
0.5PCB Condition(状态)Eye,hands(目测/手感)(继电器状Condition ofrelays Eye(继电器)态)(目测)Relays(松动/Looseness,noise,heat噪音/发热)Transformer(变压器)Reactor(轿厢)
3.Car InPart Check Point ToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(环(清洁度/损Environment Cleanliness,damage Eye,cleaner Cotton waste境)坏)(目测/抹布)(运转状态)(看/触摸)Operation Eye,handsFan(换气扇)Noise(噪音)Ear(听)55dB incar(55分贝)Looseness,cleanliness(目测)Eye(扶手)(松动/清洁)Handrail(门对齐)(铅锤/尺)Alignment ofdoor Plumb,ruler±2mm(开门)(目测/尺)Opening Eye,ruler(轿门)Car door(关门)(目测/尺)Closing Eye,ruler(地坎间隙)(尺)Clearance Ruler30±2mmInstallation conditionLock(目测)Eye(安装情况/上锁)Functioning ofbutton(按钮功能)Eye,hands(目测/触摸)(操纵盘)OPB(十字螺丝+Screw driver(松动)Looseness刀)Functioning ofswitch(开关功能)Eye,hands(目测/触摸)Functioning of emergency buttonEar,hands(目测/触摸)(对讲(应急按钮功能)Interphone机)(接收状态)(听)Condition ofreception EarOver55dB(应急铃)(听)Emergency bellsound EarOver85dB(轿内照明)(目测)Operation oflight Eye(轿厢Illumination(噪音)(触摸)Looseness Hands照明)Operation ofemergency Lamp(应Over1Lux(30min)(目测)Eye急照明运行)(大于勒克斯)1+Screw driver(轿内显示)(松动)(十字螺丝刀)CPI Looseness(显况)(目测)Condition ofdisplay EyeVibration(right〜left)(左右颤)15galRiding comfortVibration(up~down)(上下颤)PMT(身体感应)10gal(乘坐舒适感)Vibration(front~rear)(前后颤)10gal(乘Riding quality(噪音)Noise55dB坐质量)Declination oflevel(尺)Running LevelingRuler±10mm(平层精度)(平层运行)PartCheck Point ToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)Environment(环境)Condition oflights(环境照明)Eye(目测)(目测)House keepingEye,cleaner(保持卫生)(清洁器)Cottonwaste(安全围栏)(扳手)Safety guardSpanner(信息报警系统Condition ofMHS Eye,ruler4±1mm(紧Emergency Exit状态)(目测/尺)急出口)(松动)(看/摸)Looseness Eye,hands(主钢丝(张紧度)触摸目测)Main RopeTension ofropes Hands,eye绳)(钢丝绳维护)Rope Maintenance(扭结/生锈)(目测)Kinks,rust Eye(限Governor RopeEye速器绳)(压板/锚爪卡子)(目测)Condition ofclipCondition ofthimble rodEye(绳头杆情况)(目测)(铅块情况)(目测)Condition oflead Eye(绳头(平等)Hitches ropeEquality器)(弹簧情况)(铅锤/听)Condition ofsprings Hammer,ear(备母)(扳手)Double nutsSpannerEye60bend round(开口销)(目测)(折弯度)Cotter pins60(松动/对(扳手/目Looseness,alignmentSpanner,eye(轿顶Car toppulley齐)测)导向轮)(轴承油)(注油枪)Grease onbearings GreasegunInstallation condition(安装状况)(扳手)SpannerGuide shoes(on Guideshoe clearanceSpannerCar)(滑动导靴)(导靴间隙)(扳手)(轿厢)(运行情况)(听)Running conditionEarClearance(rail〜shoe)(间隙轨Taper gauge道导靴)(塞尺)〜(安装情况)(扳手)Installation conditionSpanner(滚动导(运行状态)(听)Guide rollerRunning conditionEar靴)Guide rollerspring(滚动导靴弹Measure,spanner(测量簧)/扳手)(运行噪音)(听)Running noiseEar(油盒)(油位/漏油)(目测)Oiler Oillevel,leakage Eye(清洁)(抹布)Cleanliness Cottonwaste(安装情况)(目测)Installation conditionEye(平层感应器)(精确度)(直尺)POSI MeasureRuler(看/Installation conditionEye,ear,spanner(换气扇)(安装情况)听/扳手)Fan(润滑)(油壶)Lubrication ofoil Oilcan(扳手)Installation conditionSpanner(安装情况)(轿Apparatus BoxCondition ofwireMIC Driver,hands顶设备盒)(对讲机接线)(螺丝刀/手动)connection(应(测试)Condition ofEM powerand fuseTester DC12V T急电源及保险)(直流12伏)()(手测)Operation ofon cagemode Hands(手测)Functional testofemergencyHands(急停功能)Stop switch(安Safety SwitchesInstallation condition ofSpanner全开关)(急停/安全钳开关)EES,SCS(扳手)(安装情况)EES/SCSFunction testsof EES,SCS(功能测试)(手测)EES/SCS HandsPartCheckPoint ToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(铅锤/钢Plumb,ruler±2mm(门扇对齐)板尺)Alignment ofdoorOpening,Closing Eye(轿门)(开门/关门)(目测)Car door(间距)Clearance(钢板尺)(Car-Sill-Hatch-Sill)Ruler30±2mm(轿门地坎厅门地坎)〜“ON”time18±2mm(有效距离)(钢板尺)Ruler(轿门开Gate switchLoading2±
0.5mm关)(关门凸块行程)(钢板尺)RulerOver stroke3~4mm(到位行程)(钢板尺)RulerCotton cloth(清洁度)(抹布)Cleanliness(轿门挂板)(上推轮间Hanger Clearance Up thrust
0.2~
0.3mm隙)(圆锥计)Taper gauge(噪音)(听)Noise EarEar,thermometer Less than50℃(小(噪音/发热)(听/测温计)于摄氏度)Noise,heating50Wear ofbelt Eye(门电动Door motor(皮带)(目测)机)Lessthan(触摸/尺Hands,ruler._±1(皮带张紧度)Tension ofbelt15mm子)(小于土151(垂直对齐)(铅锤)Alignment Plumb0±1mm(门刀尺Clearance bothedge Ruler X See
6.
36.4Clutch cam(离合寸)(直尺)(注意
6.3Z
6.4)器)ClearanceRuler(H-Sill-Clutch)(距离厅门地值尺)8±1mm坎离合器)〜Clearance(Door~Sill)(间隙Taper gauge5±1mm门地坎)(塞尺)〜(地Door sillshoeLooseness ofdoor shoeDriver坎/导靴)(门导靴松动)(螺丝刀)RulerWear ofdoor shoe1mm(门导靴磨损)(直尺)(电缆线松Looseness ofcable Driver紧度)(螺丝刀)RulerX See
8.3Safety shoe(安全Stroke(close)(关门行程)值尺)(见
8.3)触板)XSee
8.4Stroke(open)(开门行程)Ruler值尺)(见
8.3)8±1mm(行程开关)值尺)Switch strokeRuler(电缆线松Looseness ofcable Driver(光幕Photo sensor紧度)(螺丝刀)传感器)(检测)Testing(井道)
6.Hoist wayPartCheckPointToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(井Condition ofhoist waywall Eye道壁结构)(目测)(接(螺丝Condition ofjunction boxesScrewdriver,eye(环境)Environment线盒情况)刀,目测)(井道Tighten ofbranch cables Eye束线张紧度)(目测)(门扇垂直对(铅锤/直Alignment ofdoor Plumb,ruler±1mm齐)尺)Landing door(厅Gap(door~jamb)4(-1,+2)mm门)(缝隙门扇~立柱)Taping gauge偏尺)Gap(between doorand door)Taping gauge2~
2.5mm(缝隙门扇~门扇)(扁尺)Cleanliness Cotton cloth(清洁度)(抹布)(厅门(偏心轮间Door hangerClearanceUpthrust Tapergauge
0.2〜
0.3mm挂板)隙)(偏心轮)Noise Ear(噪音)(听)Tension Ruler,eyeDoor rope(张紧度)(直尺/目测)(门钢丝绳)EyeCondition ofrope(钢丝绳状况)(目测)(关门(关门Close springCondition ofclose springCotton cloth,ear,eye弹簧)弹簧状态)(抹布/听/目测)Condition ofdoors andsills Vacuumcleaner(厅门及上坎滑道状况)(真空吸尘器)Sill Condition of sillbase Eye(地坎)(厅门地坎状况)(目测)Door guide shoe(厅门滑动导Hand靴)(手测)SAV:
3.5±
1.5mm(门锁行程)Over stroke(switch on)and eDAV:3±
0.5mmInter lockdoor忙Eye0(门锁及门Switch(目测)(门行程限位器(开关)等MAV:3±
0.5mm开关)0等)HAV:
4.5±
1.5mm0PartCheckPointToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(护Fascia plate(安装情况)(目测)Installation Eye脚板)Limit switchDistance FLS(U/DLS□FLS)(直尺)Ruler200±5mm(限位开关)(极限距离(上限位开关/极限开关))Distance ULS/DLS(Level)(限位距离上限位开关/下限位开关(直尺)Ruler50±5mm(平层位置))Speed:distance(mm)Distance SDS1(From ULS/DLS))(1180-240:400±10mm级缓速距离(从上限位开关/下限位(直尺)Ruler(速度:距离)开关))mm(180-240:400±l0mm)Speed:distance(mm)Distance SDS2(From ULS/DLS))(2180-240:1400±10mm级缓速距离(从上限位开关/下限位(直尺)Ruler(速度:距离)开关))(180-240:1400+10mm)Speed:distance(mm)Distance SDS3(From ULS/DLS))(3180-240:2700±10mm级缓速距离(从上限位开关/下限位(直尺)Ruler(速度:距离)开关))(180-240:2700+10mm)Speed:distance(mm)180:Distance SDS4(From ULS/DLS))(45050±10mm210-240:6850级缓速距离(从上限位开关/下限位(直尺)Ruler±10mm开关))(速度:距离)(180-240:6850+10mm)Distance FLS(D/DLS□FLS)(直尺)Ruler200±5mm(极限距离(卜限位开关/极限开关))Distance ULS/DLS(Level)(限位距离上限位开关/下限位开关(直尺)Ruler50±5mm(平层位置))Speed:distance(mm)Distance SDS1(From ULS/DLS))(1180-240:400±10mm级缓速距离(从上限位开关/卜限位(直尺)Ruler(速度:距离)开关))(180~240:400±l0mm)(目测/Installation conditionEye,hands(安装情况)触摸)Hoist waycable(井道束线)(束线情况)(目测)Condition ofcablesEye(运行状况)(目测)Running conditionEye(清洁度)(抹布)Cleaning Cotton cloth(主导Guide railCottoncloth,spanner轨)(支架状况)(抹布/扳手)Condition ofrail brackets(导轨接头)(摸/尺)Rail jointsHand,rulerCondition offrame Spanner,hammer(框架状况)(扳手/锤子)Hand1〜2mm(导靴状况)(手测)Condition ofguide shoesCounterWear ofgibs onguideshoe(导靴凹槽Hand1mm(对重架)磨损)(手测)Weight(目测/Eye,hammer(拉筋)Rope hitches锤子)Hand,ear(配重情况)(手/听)Installation ofweightsSpanner,eye(松动/对齐)(扳手/目测)Counter weightLooseness,alignment(对重导向Pulley(轴承油)(油枪)Grease onbearings Greasegun轮)(安装状况)(扳手)Installation conditionSpanner(运行状态)(听)Guide rollerRunning conditionEar(滚动导靴)(测Measure,spanner(滚动导靴弹簧)量/扳手)Guide rollerspring(对CWT wedge(对重块间隙)(扳手)Wedge gapSpanner重块)(清洁度)(抹布)Cleaning Cottoncloth(候梯厅)
7.HallPart CheckPointToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(安装状Hall buttonCondition ofinstallation Hands(候梯厅按钮)况)(触摸)(按Proper Operationof buttons钮运行正常)(触摸)Hands(外呼按(触摸/目Testing thehall buttonsHands,eye钮测试)测)(清Cleaning thehall buttonbox洁呼梯盒)Air blower(吹风机)(安装情(螺Condition ofinstallation Screwdriver,hands况)丝刀/触摸)(照明Condition ofillumination Eye(指示器)Indicator情况)(目测)Functioning(all floors)(功能Eye(所有层站))(目测)(底坑)
8.PitPart CheckPointToolMethod StandardsCondition Result(部件)(检验详情)(工具/方法)(标准)(环境)(结果)(目Eye,vacuum cleaner(底坑状况)测/真空吸尘器)Condition of pit(环境)(底坑开Environment Condition ofpitswitch Eye关)(目测)(接油盒)(目测)Oil panEyeSpring BufferCondition ofinstallation Eye(60m/min)(弹簧(安装情况)(目测)缓冲器)Car:300~600(轿厢)(60m/min)Run by(缓冲距离)Eye,ruler(目测/尺子)CWT:300900(对重)(安装情Oil BufferConditionofinstallation Eye(90,240m/min)(油况)(目测)压缓冲器)(90〜Eye,ruler Car:0〜600(轿厢)240m/min)Run by(缓冲距离)(目测/尺子)CWT:0~900(对重)Installation condition(扳手)Spanner(安装情况)Governor tension(轮轴Lubrication sheaveshaft(限速器涨(注油枪)sheave Greasegun润滑)紧轮)(听)Ear(旋转情况)Conditionofrotation(扳手/目Installation conditionSpanner,eye(安装情况)测)Compensation ChainDistance(floor~chain)(距离Ruler300±100mm(补偿链)(底坑底面~补偿链))(尺子)Round ofchain Ruler230~280mm(
①8)(补偿链回弯弧形)(尺子)(扳手/目Installation conditionSpanner,eye(安装情况)测)(钢丝绳张紧(手测/目Compensation rope,Tension ofropes Hands,eye度)测)guide railand pulley(补偿绳/主导轨/Kink Hands,eye导向轮)(绳头)(手测/目测)Cleaning(抹布)Cottoncloth(清洁)(扳手/目InstallationconditionSpanner,eye(安装情况)测)Whisper flex()(吊钩/S-Hook/Mesh grip“S”(目测)Eye啮合夹)(轿厢楔(扳手)Car wedgeSpanner(楔块缝隙)Wedge gap块)(清洁)(抹布)Cleaning Cottoncloth。